SLB Changhe Integrated drilling service project in China

Scope of service: Integrated drilling service

Project Bright Spots: the project executed since 2014, 3 sets 1500HP drilling rig, cumulative operations of 25 wells as of early the end of 2019, completed the deepest well (5010m) in this block, created many first prizes.

Yanchang Oil Integrated drilling service project in China

Scope of service: Integrated service of drilling

Project Bright Spots: the project executed from 2013 to the end of 2018, cumulative operations of 91 wells as integrated drilling service, completed the first Horizontal Natural gas well, won the Excellent Contractors many times, set a good corporateldentity of Shandong kerui petroleum technology co.,ltd..

Tuha oilfield workover project in china

Scope of Service:New well production, injection operation, oil and water well measures, overhaul, minor repair, maintenance operation, hot washing

Project Bright Spots: the project executed from 2015 to March 2020, cumulative operations of over 2600 wells, 10 set 450HP workover rigs, 2 set 550HP workover rigs worked in this project, increased well Hot washing project in 2019, expanded the company scope of business in Tuha Oilfield.

Acid-fracturing project in Tuha oilfield, China

Scope of Service: Acid-fracturing, water injection storage

Project Bright Spots: cumulative operations of 1000 layers, 100% qualified, strongly support the oil stimulation in Tuha oilfield.

Nitrogen Project in Tuha Oilfield, China

Nitrogen foam flooding tertiary oil recovery technology viscous oil reservoir

Project Bright Spots: Nitrogen foam oil displacement technology (2014-2020) cumulative oil increase exceeds 100,000 tons, increased oil recovery by 10%.

Coiled Tubing project in Karamay oil field, China

Scope of Service: coiled tubing drifting, perforating, sand washing, salvage engineering technology service and dragging fracturing etc.

Project Bright Spots: 4 sets of coiled tubing equipment, Cumulative operations of more than 300 wells (as of the end of 2019), Many times completed the drilling and grinding of bridge plug operations for high pressure and high gas bearing Wells and the salvage and killing operations for emergency rescue wells,  and contracted dozens of complex wellbore processing tasks.

Fracturing and Coiled-tubing project in Southwest gas field, China

Scope of Service: Fracturing and Coiled-tubing

Project Bright Spots: Building bases in Neijiang, Luzhou and Yibin, the service capacity can cover the whole Sichuan Shale Gas market.

Cumulative operation of 130 wells, 400 layers per year, the team have been praised many times by excellent equipment, professional engineers, standardized operation process, 100% qualified service execution.

Nitrogen Project in Tahe Oilfield, China

Scope of Service: Nitrogen stimulation, fluid discharge, Nitrogen flooding and replacement

Project Bright Spots: The largest gas injection oilfield in China, we are responsibility for over 60% gas injection service, the average annual gas injection up to 140,000,000m3 per year. 99.9% High purity, 50Mpa output pressure PSA nitrogen generation equipment which R&D by Kerui

Nitrogen Project in Huabei Oilfield, China

Scope of Service: Nitrogen foam stimulation, Nitrogen foam flooding

Project Bright Spots: The measures effective rate 100%, average oil increase over 2,000tons per well. Huabei oilfield Qianshan reservoir with large reserves but high water content, it’s hard for customer to improve recovery percent, after select Nitrogen foam flooding to use in oilfield, the sweep efficiency is increasing and the oil in wells are flooding and replaced.